Conditional Routing

Define branching logic for approval chains based on experiment risk level and parameters

3

Active Chains

13

Total Steps

158

Total Uses

3.3

Avg Steps/Chain

Chain Simulator
Preview which steps will be skipped or required based on risk level

Revenue Experiment Chain

High RiskRevenue
4 steps34 usesLast: 2 hours ago
1
Tech Lead Required
24h timeout
2
Product Manager Required
48h timeout
Skip whenrisk_level == low
Finance Director Skipped
72h timeout
Skip whenrisk_level == low
Skip whenrisk_level == medium
Required whenestimated_revenue_impact > 10000
4
VP EngineeringOptional
48h timeout
Required whenrisk_level == critical
Simulation for Medium Risk:
2 required1 optional1 skipped

UI/UX Experiment Chain

Low RiskDesign
2 steps67 usesLast: 5 hours ago

Infrastructure Change Chain

Critical RiskEngineering
4 steps12 usesLast: 3 days ago

Growth Experiment Chain

Medium RiskGrowthDisabled
3 steps45 usesLast: 1 week ago